Overview
Peat to Power in Rwanda
Rwanda peat study indicate that Rwandan peat bogs contain up to 155 million tonnes of dry peat covering a combined area of 50 000 hectares. About 77% of peat reserves are near Akanyaru and Nyabarongo rivers and the Rwabusoro Plains.
The study indicates a potential for electricity generation from exploitable peat reserves of about 150 MW for sod peat application and 117 MW for milled peat application based on 30 years of operation.
- Gishoma 15 MW Peat to Power Project
Since 2010, the Government started development of the 15MW peat power plant in Gishoma, Rusizi District, to reduce electricity deficit which the country was facing and to coincide with a significant growth of electricity demand observed in the region as a result of the expansion of the local cement factory and country development.
In the above context, the consortium of Shengli Energy Group Co. Ltd/Shandong Run Power Plant Engineering Technology Co Ltd was awarded in 2012 a contract to build 15 MW Peat Fired Power Plant in Gishoma, Rusizi District, Western Province.
As it was the first of its kind in Rwanda and in Africa in general, the plant was constructed as a pilot power plant to demonstrate the possibility of generating electricity from peat energy available in the region. Currently construction works have been completed and the power plant was tested and connected successfully to the grid.
The project was completed in 2017 and both testing and commissioning have been successful. REG asked the building consortium to fix some few technical issues before handing over the plant to Government for operation and maintenance.
Hakan Project
YUMN Ltd. is developing a 70 MW peat fired power plant in South Akanyaru prospect in Gisagara District and the project is to be developed as Public Private Partnership (PPP). On Feb 10, 2016, Amendment and Restatement Deeds for Power Purchase Agreement, Concession Agreement and Government Guarantee have been signed. Since February 2017 the project is under construction phase and it constructions activities will cover a period of 45 months from the effective date which occurred on 14th November 2016. The operation period is 26 years from commercial operation date. At the end of the operation period, HAKAN will transfer the power plant back to the Government of Rwanda.
Project List
Related Projects
110kV Jabana-Mt. Kigali-Gahanga and associated substations
The project consists of building a 27km long 110KV transmission line linking Jabana, Mont Kigali up to Gahanga Substation.
View projectRuzizi III
Rusizi III Hydropower (145MW) construction project is supported by the World Bank, EU, AfDB among others with an expected investment capital of $450 million and is expected to be completed by 2024. The project is being developed under CEPGL umbrella for Rwanda, Burundi and DRC. Rusizi III hydropower project planned to generate 147MW and the power output w…
View projectKigali Network Strenghening 2
Rehabilitation of MV underground cable within Kigali city Centre, construction of a 1.5km four circuit overhead line between Gikondo and KBC; replacement of MV underground cables from KBC to Christus. This Project is divided in 3 lots:
View project110 kV Gasogi-KSEZ
The project consists of building a 2.2km long 110KV transmission line linking Gasogi substation to Kigali Special Economic Zone
View projectShema Power Lake Kivu
Shema Power Lake Kivu Limited (SPLK ltd) signed a 25-year power purchase agreement (PPA) with the Rwanda Energy Group (REG) for a 56 MW net power output from methane gas. The Power plant will be located on Nyamyumba sector in Rubavu District. The first barge will provide 14 MW of electricity 15 months after the project reaches Financial Close.
View projectKigali Network Strenghening 1 - 1
Improved stability of power supply in Bugesera and parts of Kigali by replacing a10MVA transformer by a 20MVA at Mont Kigali substation
View project