What We Do

Solar

With a potential of 4.5 kWh per m2 per day and approximately 5 peak sun hours, solar energy has a huge potentiality in Rwanda. Currently, Rwanda’s total on-grid installed solar energy is 12.050 MW originating from 3 solar power plants namely Jali power plant generating 0.25MW, Rwamagana Gigawatt generating 8.5 MW, and the Nasho Solar plant generating 3.3 MW.

At a Glance

4.5 kWh/m²/day

Average solar resource

Reporting period not stated

Overview

Solar

With a potential of 4.5 kWh per m2 per day and approximately 5 peak sun hours, solar energy has a huge potentiality in Rwanda. Currently, Rwanda’s total on-grid installed solar energy is 12.050 MW originating from 3 solar power plants namely Jali power plant generating 0.25MW, Rwamagana Gigawatt generating 8.5 MW, and the Nasho Solar plant generating 3.3 MW. 

The Government of Rwanda intends to increase the number of solar power plants to reduce the cost of production and take advantage of available renewable sources in Rwanda.
 

Project List

Related Projects

Generation , Hydropower

Ruzizi III

Rusizi III Hydropower (145MW) construction project is supported by the World Bank, EU, AfDB among others with an expected investment capital of $450 million and is expected to be completed by 2024. The project is being developed under CEPGL umbrella for Rwanda, Burundi and DRC. Rusizi III hydropower project planned to generate 147MW and the power output w…

View project

Transmission , Medium Voltage

Kigali Network Strenghening 2

Rehabilitation of MV underground cable within Kigali city Centre, construction of a 1.5km four circuit overhead line between Gikondo and KBC; replacement of MV underground cables from KBC to Christus. This Project is divided in 3 lots:

View project

Transmission

110 kV Gasogi-KSEZ

The project consists of building a 2.2km long 110KV transmission line linking Gasogi substation to Kigali Special Economic Zone

View project

Generation , Methane gas

Shema Power Lake Kivu

Shema Power Lake Kivu Limited (SPLK ltd) signed a 25-year power purchase agreement (PPA) with the Rwanda Energy Group (REG) for a 56 MW net power output from methane gas. The Power plant will be located on Nyamyumba sector in Rubavu District. The first barge will provide 14 MW of electricity 15 months after the project reaches Financial Close.

View project