As of end of June 2023, the total length of the transmission network, including 220kV and 110kV lines, was recorded at 1158 km across the country.

At a Glance

1,158 km

Transmission network length

June 2023

1,158 km

Transmission network length

June 2026

Overview

Official REG energy infrastructure

As of end of June 2023, the total length of the transmission network, including 220kV and 110kV lines, was recorded at 1158 km across the country. 

The 70kV lines previously running through Birembo-Musha to Kabarondo substation that existed till 2013, were upgraded to 110 kV to improve network reliability and power supply stability amidst the country’s changing power demand profile. 

Official REG energy infrastructure

Related Projects

Transmission

220 kV Mirama-Shango

This is a 220 KV line connecting Rwanda to Uganda with a length of 93.5. It will facilitate the interconnection between the two countries.

View project

Ongrid

Scaling- up energy access Project

(a) 25,438 households connected to national electricity, (b)179 schools, 29 health centers and 25 sector and cells administration offices with access to electricity in the project area, by (i) constructing 464Km of MV distribution lines and (ii) 710 Km of LV network.